Forum Replies Created

Viewing 20 posts - 21 through 40 (of 1204 total)
  • Author
    Posts
  • Pat K
    Keymaster
    Post count: 1210

    Popped the middle headliner panel in first thing today, marked  the opening for the sub-hatch and got it cut out.14F9EDCF-7578-4714-9B98-022A83991C0C15984289-1DE2-4A6C-94CE-A7B8159E8139

    Prepped the new panels with pre-stain. 1CEC60BE-4236-418A-B933-05F59AF7DC3E7FB96281-DE98-41C6-B830-7BE799887D6FB1A65702-5BAE-4F6C-9806-C0F0494704BA

    Laid down the first coat of stain. These need at least six hours of dry time before they will be ready for the second coat early in the morning.0FF0D07E-159A-45C4-B375-A6363984AD499829CB7B-7F8D-4906-8B3E-1B72B828E61ABA69314C-D335-4A04-AA97-8656EA8CB4517E241488-589C-41C1-9592-17FEEEE512C3

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210
    in reply to: Class 11 ideas! #44769

    How about a off-road style roof rack with some fancy LED lights mounted to it?

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Finished repairs and sanding on better then half of the cabinets between yesterday and today. C74F32A7-DA6D-40C4-ABCB-50420C865150

    The others are sanded with just a few repairs still drying. I’ll finish sand those spots in the morning. 1856DCBB-AA79-42D5-A950-C59137623B52

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    New Limba interior panels arrived. Sanded a cleared test section on both new and old. EF2A1335-69B1-48EE-BB2F-32D3463D96B8

    Had a color matched stain mixed up so new and all the woodwork will blend together.2707F9DF-8DFC-4C3F-B287-699A9F116E3C

    Scraped old adhesive from a previous sticker veneer off the stove cabinet top. Should sand up nicely now.CF8C17F9-611F-4CC5-9802-6D0FCCF68E0BF958531E-2BEF-413A-AC3D-C63037C00AF75932C3ED-0F86-4823-BECB-63E4FA21CB5B

    Spent yesterday fixing pilling and missing sections of veneer on cabinets. More of the same planned for today. EEF4EDBD-B5D7-4F56-96A7-A380F85D197FF373016E-DCD7-4B6E-AA74-664CA75519FEBC6135BC-4B04-4F5A-8A6F-7FF1DC4D0961132BA114-3745-4433-8DAF-7E36716FC3A8

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    He’s hard at it right now. LOL!!!!231BE5C6-F74C-459C-A1A1-9ACAA32C6479

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Back to roller status!!

    Finished trans assembly this morning. Just finished installing in bus.

    One piece boots because we could.9C74E145-5B4E-4080-A227-3DB2836B1F0566DF5A43-14E8-4497-AD83-EB15708497A3

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    We pulled the motor and trans yesterday evening. Jesse was up late disassembling and cleaning parts. I’m heading out to the blast booth now to clean up axel tubes and redux boxes for sealer and paint, Jesse is still cleaning up bits and pieces. 5C7C40DC-3E38-4942-976B-61943A062FA93398BB32-4FF1-4E30-A82B-A2DC297FBEC2

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Bent up a pair of new mounts for the EFI box  and organized the wiring under the rear seat. Just a few wires to hook up before start up.BA9E9DBD-F45B-4130-9408-0FCF318B058DB77123B7-0B10-489D-BBD5-372098E4A0B0

    Intake bits shined up and fit. Throttle linkage as well. C6951856-7D52-4E95-91EA-7B1DC2CD8DAB

    Driver side oil cooler & kafer bar back in. Wiring organized and secured. Header, turbo, and oil lines all done on the bottom side.AD6DB4C1-1AEE-4F8E-95DA-441273236DB22F9092FD-110B-46AE-B98B-34072A856E4F

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Not sure a single intake set up would make things much easier in the smaller Oval engine bay.

    I had to pull the alternator, intakes, valve covers, valve cover mount studs, and the crank trigger sensor. After a precise tilt/ shimmy/ shake/ and lift it all slide together nicely.DF860614-D4C2-417A-A146-A95EF306A9DC47DE57B8-BA87-4538-B469-BEAE03F4BA77

    Just enough room to get a socket set up behind the shroud to tighten the fan down.8921CFB9-AC01-4DCD-B6EB-43C2C7DC58774AB37206-0FCC-493A-A35E-B65CD5C566FC

    Shortened the valve cover mount studs so valve covers can be pulled without pulling studs. New seals as well.
    CC254A34-170F-470F-B962-D7ED8D9CF7B41B443CB0-DFA6-48E8-AA80-CE39EC6BC46234C7EACE-7230-439F-94F9-F862F6FA6D49

    Trans mount studs had to lose a little height to clear the new fly wheel set up.36C30CE9-E1F3-4E6C-893D-3492C5B177E5CA186882-2557-4B59-AB99-E2875E78DF89

    Mounting the new EFI  box and organizing the harness is up next.
    C88AA7A9-AF24-4357-87E8-7783455C9A19

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    ^^^ If I was looking for a tow rig I probably wouldn’t buy this one but it looks fuckin’ awesome!!!

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    26193C1B-363B-4C49-A35A-FE8BEEE4BFD121A880A1-27A7-41B2-A2E6-4228A2899712

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    DFF38AB2-F2FC-411D-99B1-27950591498D

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    View from the clean shop today. 95B470DD-6935-483A-BE4D-7024E09326B8

     

     

     

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210
    in reply to: Fucking Bubba!!!! #44430

    The struggle is real!  😢😢

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Parts have been rolling in for this one.

    New running board clips along with anti-rattle spacers installed on trim and test fit trim. Storing trim safely for now, will install just before we ship the car out.B6FF78B5-91D1-49FB-BC37-3D8BFED9653BFD7E3CDE-D86C-4476-81B5-0601ACDA22996DD455CC-B962-4843-9CB8-0FEC3C1944AD

    Air intake temp sensor installed on intake base plate.
    12036A9C-4FED-4354-953A-D88CF254C83C6C1B29E4-A5A3-46B3-A49E-82CDAC937FCB3CDAB4C8-D7A0-4068-ABD2-1BA64D6C4F2F4679EAF0-305B-4A56-A185-C7D568E5D032

    Removed .200” from the throw out bearing collar per RLR specs.A701C9A0-CCF8-4F03-9C75-B01A903E62E0D0FF3607-9779-4EA4-B1ED-A4C01980E5C3

    Pulled 7mm studs from a donor trans. Installed with with some red loc-tite love.EED58B41-24C4-44E8-A798-59F60069602F

    Pulled out the old EFI wiring. Enlarged the wiring pass through for the new harness. B060E27F-7974-4D47-A1E7-176563F583972CB8CB68-37C5-48E3-9D68-466848A3FFF5

    Fancy rivet in grommet. I like this style for larger holes.372C64F3-FCAA-44DF-A6BA-D72911393801

    Pulled intakes. Prepping motor for install.2E984243-6AC4-4D3F-BD44-B23DD25E47FC

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Fit hoop bows this morning. Popped back in about 6 o’clock this evening and finished drilling, countersinking and sanding bed and hoop bows and applied first coat of urethane.

    “I’m tired. I think I’ll go home now.“98931C95-D9F4-4B1E-866B-F1870DCF16FED7153F87-7768-461E-BF94-A5A43BC8F52863D58A42-9346-4B49-9369-FB2AE992608C1DD953D4-F82C-4431-9573-56FB11803FE9972ABB60-5A8B-436B-B2CE-86F1029B0426CE3C5698-8948-497F-9091-81CB97587CF7DF05FBD7-0B17-44C2-8F48-60AE2EF52DE7

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210
    in reply to: Coleman? #44264

    Look at all the closet Coleman addicts coming out. Lol.

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Wood bed and hoop slats showed up yesterday.  Started laying out holes in bed slats this morning and picked up some urethane to seal them.

    4A995FC2-CF12-4378-BCE1-53827A8F10BD23867CDF-1A83-453A-AFDD-240F2E745FAD4AF0240E-0962-4527-ADB2-7AB33EF351AD

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210
    in reply to: KCW randomness #44188

    Franz is good at getting you guys amped up. LOL!!

    We will build it if it comes.

    Pat K
    Keymaster
    Post count: 1210

    Fresh b pillar upholstery installed and qtr window back in.7B26E64F-E927-451B-8BC1-262F653CB99EDFAE280D-900B-4CA4-AF42-321EF4DC973F

    Swapped out the early style clutch operating shaft for a late-model shaft due to the RLR rev6 clutch. Also ordered this bearing and shaft kit from RLR.

    https://ronlummusracing.com/product/collar-throw-out-bearing-shaft-kit/AD9AF35B-BE78-4AA5-A326-30F0A3F3D0D0D70E5A44-F80D-48C4-BDC7-75CCB498153A

    Installed new fittings and vac lines.3891864D-2C17-4217-94FC-C4C5847F1CA7A00C0117-864A-457F-A323-59AA9C612400CBD54484-B645-4045-A799-6E929DEAC33FFC70FC8C-DC38-4C4D-AF32-6E42A63C01A8DACA87D0-1BEE-4A22-8492-DBD535F899D4

    Used this heat protection on the vac lines and O2 sensor wiring that run close to the exhaust. EACF1335-3475-4194-9510-89E0F90521BCF8E3F203-09D6-4109-9C50-018CC9126C1DE8A52BF8-55CB-4B9C-BD98-C9D0A19C9E0C250A87EC-E9CA-4260-A866-6CC6AFC22915

    Springs on the inside of vac lines so the don’t collapse were bent. 17A48F3B-EB98-4018-9736-E294DC3FB797

    Rev6 clutch installed. End play in spec. 8D011F5A-D921-4CCA-BFC8-D426E059EE9D3B739E99-B6B0-4738-BABF-F82F25BFB7419178CCB2-7F89-44D9-8040-9B3C94CB6F6D

     

    We will build it if it comes.

Viewing 20 posts - 21 through 40 (of 1204 total)