Forum Replies Created

Viewing 15 posts - 16 through 30 (of 2051 total)
  • Author
    Posts
  • Pat K
    Moderator
    Post count: 2065

    Been back at it for a bit this morning. Couldn’t find any headlight buckets, I put them on the WW list.

    Working a seal channel repairs.  Pass side fabed and ready to burn in. F8E1E94A-7D40-4D06-ABE6-B8C652432E2DA98335B0-2B5F-4827-A0B5-947703A1D61282EA7A00-D924-459D-BC11-B29EFEAD83D3

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Dialed the nose in before calling it a day. All grinding done and edges rolled. 6846C9BF-5DAE-4B67-8EC8-29D1BE3979B9ED9B94E9-3BC6-44FE-A251-342680E31F385EDB2E8C-2168-447F-8568-76DCFD838FB6AB991CF5-9E38-4546-90FE-037F9558659BEDB12529-DBC2-46D8-91DF-CCD5FE884CAF

    Headlight buckets, turn signal bases, and 2 small sections of door seal channel to finish the nose completely. 028C074D-0556-4A10-B322-0EE591D9434345E26767-B978-4F99-8348-D94396B6811E

    Almost there!!!81E93151-B299-4CDD-AE7A-223A5EB7975EFFF09B22-A9CB-4914-8002-4F597A010560BFB4BEA3-5284-4AC3-BE17-381E6C0B1629

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Anyone heading out from the SLC area on Thursday or Friday morning before it gets hot?

    Riley and I are trying to decide which way we want to roll.

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065
    in reply to: Dawgs #58243

    Dawg crew runs deep around here!!!4873C0C5-A2CF-4310-8091-946AF0426175134A06E9-8BDF-46CC-82CA-E30080F49D95

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Glen Helen is just over 2 weeks away. Plenty of time to test and tune.

    Super excited to be going to this one!!! Legendary track!

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Just finished welding the nose. Need to work the edges over along the a-pillars and bottom, and trim off the excess bits. 56432B95-CF8F-41E9-ADD6-E472C215B0D640BE870B-0E5F-4E3E-B7E6-F6D2DBBCE748F52B0586-8314-452B-80A5-2137B72BCFEB77B8074D-6E40-47C0-8FB9-EF8170AE6C4D

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065
    in reply to: Parkway projects #58223

    Parkway shit…A5E2CC8F-44CE-436D-90E9-80D59CAC1A52

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Finished fitting the nose. 5D5DD42D-3D82-4BD1-9A43-AF49482595F11AAE1B05-D9A6-4ABE-9EEA-36D85079F45525BD8116-F853-41D8-8DD3-8BD5F0102D0E

     

    You going to paint inside the nose before you glue it on for good?

    Epoxy sealed for you pleasure…😜😁😘6CDF4CB8-64DA-4B72-B0B5-CF5A308B1666C0570C25-1C9D-4D2A-A003-3A9A783AC9563E76A5B5-2F1E-4FD9-BB9F-B70E9849F98E4C466F4B-D32B-494D-B6DB-AD52ADA89B4F5EFF5C50-BCBB-4D1D-AB52-BD2E67996E7761FE1C1B-ECF2-4688-9EE8-DA89BCEC2AB8

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Burned in the dash repair.027C5AD4-6F99-46DC-AB4A-849B5C0C2BCFD0335F64-F744-4D1C-B395-4212A22A3A23

    Fit and burned in the outer valance.A3460C87-3258-4C60-AD0C-6593E8707B6B6359E387-7E87-4A85-9DAC-4663B88E5F82923EF62C-2B14-4895-93C4-A99F90C6FBCFD11A1372-3768-4DF2-A116-F2E1D58A622B

    Nose is up next.9CE54405-9724-4D09-B3B6-EF032566F25EA16BA2AA-82EA-4248-BB89-45A572073CE7

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Knocked up a new lower center window section. A2F7BCFB-2120-4227-8F65-4F096732FA9CB975C698-C830-4FCB-9BF7-F9C17BBE4E36

    Fit and burned in. CECF62CC-BCE0-44B4-9B04-39DDD35B9A6DED530657-C833-4451-A49C-2C046DF761178184F3FD-CDD9-40C4-9428-A72CE6016878

    Fabed a fit a section for the driver side of the dash/window surround. Ready to burn it in. 323EEE1F-C483-4A7C-814B-7B138ABB3FBBEF4D7E83-751E-45A5-9CF9-28F580E485FE1793DA17-197E-4D42-B0CD-5F15553B896E

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Burned in the front floor and tacked the heat tubes and heater cable tubes in. 784779EB-9D6B-4BF5-9AEE-EA984EFF13AB58992F72-6EE2-492C-8777-B6CA581701AAD2861424-C6D7-4D4D-B4EC-6BADD7C312260C5CDAC5-85EF-48B7-8B77-6139B6486DFF

    Haulin loads already!4837478A-0E82-499E-9972-82D10F79EC9F

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Finished bottom side pedestal welding this morning.  Blasted, rust repaired, and fit the heater tube section. C8E4AE7E-C785-42D5-BE04-50E9F8618FF6860A8FED-8BE4-4301-BB6C-3045196B7229E1944175-AC7F-4FF8-91D6-CD85033A75A0671F304C-5D87-422F-803A-01C246D37C47

    Slid the front floor in.  Ready to start melting it together.AD83A48C-1DE6-4F4A-B6A0-478ABEE4FAFA

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065
    in reply to: Cole’s 65 Beetle #58146

    5EEF91E9-40C1-4B76-B56C-AFF0CCFBC51F

    Nice daily bro!!!

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Riley just finished scrapping the last bits of tar board off the donor section. 55ABB6B4-75F7-4706-B239-B446C269BD842B55E11B-E636-44BA-9D67-180CE62FD2F104455648-8E4B-4B22-8A06-AF20A90FAD9D

    Dissecting all the bits off is his next mission. A2D90803-4DB3-42D1-97E6-188B138BFAE2624378C3-46D7-418E-B2A1-031A10413B29A30F33E6-0361-4E68-8872-222FFDB37319

    We will build it if it comes.

    Pat K
    Moderator
    Post count: 2065

    Knocked the seat pedestal off the list this afternoon. 04F3FEB6-EF56-4CFE-8509-3EEFED542094

    Heater cable mech dissected from the OG pedestal and welded to the tubes.CC289727-C4E2-4686-9B0E-3843D60E4180

    Welded all around.EBF72243-5FF3-4E8A-B6D8-112E969C9A984042E5EC-98BB-4267-A151-DC1D348E1FB8

    Franz suggested using a section of the OG pedestal for a glove box door. 5CB0AE62-665D-442F-81FE-3F578DC673E4

    The opening will get trimmed with rubber edging.08E4B428-8DD0-4E7C-A3C6-79C810875C3B7C753806-BE50-4139-8F74-28E31A42BA3E

    Used a earlier beetle glove box latch. Need to sandblast the door before it gets welded in.B81366C1-E8B7-4984-BE4C-69975D5BA34CD01D7E71-6ADD-4F50-BE22-88FC1EE69E03

    You can upgrade to a lockable unit later. https://www.wolfsburgwest.com/cart/DetailsList.cfm?ID=151857127B

    We will build it if it comes.

Viewing 15 posts - 16 through 30 (of 2051 total)