Forum Replies Created
-
AuthorPosts
-
in reply to: JJ’s Class 11 Oval #58242
Glen Helen is just over 2 weeks away. Plenty of time to test and tune.
Super excited to be going to this one!!! Legendary track!
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58241Just finished welding the nose. Need to work the edges over along the a-pillars and bottom, and trim off the excess bits.
We will build it if it comes.
in reply to: Parkway projects #58223Parkway shit…
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58215Finished fitting the nose.
You going to paint inside the nose before you glue it on for good?
Epoxy sealed for you pleasure…😜😁😘
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58209Burned in the dash repair.
Fit and burned in the outer valance.
Nose is up next.
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58203Knocked up a new lower center window section.
Fit and burned in.
Fabed a fit a section for the driver side of the dash/window surround. Ready to burn it in.
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58160Burned in the front floor and tacked the heat tubes and heater cable tubes in.
Haulin loads already!
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58147Finished bottom side pedestal welding this morning. Blasted, rust repaired, and fit the heater tube section.
Slid the front floor in. Ready to start melting it together.
We will build it if it comes.
in reply to: Cole’s 65 Beetle #58146in reply to: The ‘58 Hacienda Panel #58144Riley just finished scrapping the last bits of tar board off the donor section.
Dissecting all the bits off is his next mission.
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58127Knocked the seat pedestal off the list this afternoon.
Heater cable mech dissected from the OG pedestal and welded to the tubes.
Welded all around.
Franz suggested using a section of the OG pedestal for a glove box door.
The opening will get trimmed with rubber edging.
Used a earlier beetle glove box latch. Need to sandblast the door before it gets welded in.
You can upgrade to a lockable unit later. https://www.wolfsburgwest.com/cart/DetailsList.cfm?ID=151857127B
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58105Fit the new main heat tube and the other bits to start the day.
Gas tank mounts fit and burned in. Finished all the welding for the cargo floor and gas tank area.
We will build it if it comes.
in reply to: Scott’s ‘61 Shorty #58096Jumped back into this one today. Chopped 2” off the lower rear section of the pedestal then bent a new lip.
DANG!! Not quite.
Had to chopped a couple inches off the front edge of the rear section to narrow the pedestal a bit more. BOOM!!!
Slid the drivers side cargo floor section in followed by the pass side. Just a few more welds to finish up tomorrow and the cargo floor is done!
We will build it if it comes.
in reply to: The ‘58 Hacienda Panel #58095Riley chopped out the donor section this morning.
He spent the rest of the day scrapping very well aged horse hair tar board.
This was a super crappy job to have to do. Thanks for knocking it out bud!!!!
We will build it if it comes.
-
AuthorPosts