Home › Forums › KCW Current Projects › Brendans ‘65 Alabama Camper
-
AuthorPosts
-
Back at it today. Fitting the pass corner section.
Uuuuuugh.
Couple of relief cuts and it’s good to go. Ready to burn in.
We will build it if it comes.
Pass side corner section burned in. Tac, tac, tac till it’s done.
Fit/ burned in the driver side d-pillar section.
Started fitting the driver side corner section also.
We will build it if it comes.
Finished fitting and burned in the driver side corner section this morning.
Cut in taillight holes as well.
We will build it if it comes.
^ Thanks you Sr.
Fabed a patch section for the lower front pedestal lip that looked like Swiss cheese.
Burned in and dressed welds.
Pass side needed a couple small patches as well.
Front floor fit.
Blasted the front floor. Epoxy sealed the bottom side of the floor, front frame area, and the heat tube sections.
Riley is starting weld prep for the cargo floors this morning.
Time for a new nose.
We will build it if it comes.
Looking awesome. Brendan, call me today.. Thankyou. JJ
Never make someone a priority, that makes You and Option. 🤔🤔🤔🥲
Riley has weld prepped all of the cargo and front floor areas.
Fit and welded the window and nose sections together.
Fit that to the bus. Ready to burn it in.
We will build it if it comes.
Just finished grinding welds on the passenger side rear corner.
Onto the driver side!Ground welds on the driver side rear corner earlier.
Began grinding welds on the nose as well.
Killer project… Kendall’s are killing it for sure…
Brendan.. You out there? We didn’t get to talk yesterday.. 😎 😎 😎
Never make someone a priority, that makes You and Option. 🤔🤔🤔🥲
Burned in the nose/window section yesterday.
Brendan…do you want turn signals or keep them shaved and use the running lights in the headlight buckets?
We will build it if it comes.
Cargo floors burned in. Wooooo!!!
We will build it if it comes.
woooo yeah!!!!! All the prep it takes to drop in a floor like that…. 😎 Nicely Riley… and always Pat… 😎 😎 😎 😎
Brendan, turn signals? ofcourse, that can be done when ever..
Never make someone a priority, that makes You and Option. 🤔🤔🤔🥲
Brendan you out there bro? Be nice to hear from you…😪
Front floor burned in.
Fabed a section for the lower door seal channel repairs. Pass side done.
Driver side needs the same.
Small patch on the pass dash/window opening.
Driver side needs the same thing along with a couple extra hole in the dash.
We will build it if it comes.
-
AuthorPosts
- You must be logged in to reply to this topic.