Home › Forums › KCW Completed Projects › Panama Red
-
AuthorPosts
-
Pats making his way around, working on pass dog leg now…. it’s got a couple bad spots…. 😎
All work and no play makes JJ a dull boy🤣
Keeping a lid on it😎
Attitude is everything 🤔Burned in the lower valance on Friday. Riley took care of the grinding.Â
Started on pass dogleg Friday also. Attached to the A pillar again and started on repairs. Trying to keep as much OG metal as we can.Â
Couple of more small patches on the outer this morning.Â
Working on the inner side now.Â
Pinholes always grow when you start to pick at them for repairs…🙄🙄🙄
We will build it if it comes.
Finished welding the pass inner rocker repairs and fabed one more that will get fit/welded after the front floor is fit.Â
Fit & welded drivers lower dogleg section yesterday also.Â
Finished yesterday out hammering the front section of the drivers rear fender well back into usable shape.Â
After
We will build it if it comes.
Fitting driver side inner rocker, tophat and outriggers this morning. Ready to burn the rear in.Â
Small frame repair to address up front.Â
We will build it if it comes.
Burned in the drivers rear tophat section and outrigger.
Frame repaired.Â
Fit the drivers front tophat section, B pillar section, fabed/fit the bulk head repair section.
Welded.
We will build it if it comes.
Excellent work guys. I am super stoked!!!
Burned in the driver side lower B pillar section this morning. Fit and welded the driver side jack points as well.Â
Riley started today drilling holes in the driver side cargo floor.Â
Trimming for fit now.Â
Ready to start burning in the B pillar lower closing panel section.
We will build it if it comes.
Worked on trimming and drilling on the driver side cargo floor this morning. Drilling all those holes can wear your arm out FAST!
This afternoon I’ve been dressing welds on the passenger side dog leg and lower A pillar.
Time for the driver’s side now!Finished burning in the closing panel and dressed welds in the area.Â
Moved onto long side support lower section repairs.
Finished yesterday out setting up to get the wrinkles out of the rear parcel tray.
Started pushing this morning. Just needs a bit of hammer/dolly work before it’s happy.Â
Going to get the rest of the wreck damage on the drivers rear quarter worked out next.Â
We will build it if it comes.
good job Pat
This rear quarter was a total mess. Started with a few pins.Â
Then a few more.Â
I’m sure this will do it…🙄
Then a round two after cleaning off round one.Â
Fell like it’s about 81% done.  Need to knock out a round of hammer &  dolly work before starting the long side section repair.Â
We will build it if it comes.
-
AuthorPosts
- You must be logged in to reply to this topic.